← All projects

Kew, Richmond upon Thames

Kew

Five executive houses with basements, at the end of a tight cul-de-sac.

Design and build main contractor for a developer client

Kew - five modern executive houses with basements, built by Kisiel Group as design and build main contractor

Scheme type

Ground-up new build

Homes

5 houses with basements

Status

In progress

Highlight

£4.3m D&B contract, 5 basements

The brief

A developer client appointed us as design and build main contractor in January 2024 to build five new family houses at the end of a tree-lined cul-de-sac in Kew. Planning was granted by the London Borough of Richmond upon Thames.

The site held an old bungalow and a row of garages. We demolished them and started construction in April 2024.

The build

Working with the neighbours

Access was very constrained: one narrow road in and out, shared with residents. Before we started, we set up a dedicated website for the scheme, haverfieldgardens.co.uk. It holds the Construction Management Plan, regular newsletters and a named contact, so neighbours always knew what was happening and who to call.

Where it is now

The houses are in the final finishing stage.

Got a scheme like this?

Send us your drawings for a price, or tell us about your site.