Anerley, South East London
A break-even scheme turned around for our client
Main contractor for a developer client

Scheme type
Homes
Status
Highlight
A developer bought a derelict shop with planning for 9 flats and wanted to start quickly. The site borders Network Rail, so several licences had to be negotiated. Tenders and a Quantity Surveyor's report showed the scheme would only break even.
We helped the client bring Network Rail's scaffold and hoarding licence fees down significantly. Without that, the project would not have gone ahead.
We reviewed the client's requirements and the design during estimating and cut the build cost by over a quarter.
Parts of the design used valuable space which was not needed. Changing them added around 450 sq ft of sellable floor area and room for 4 more bedrooms across the scheme.
A scheme that would only have broken even became a viable development for our client. 24 months overall, with a 15-month build, under JCT Design & Build.